Menu

Portfolio

Our product portfolio includes gas, steam & hydro turbine controls services and upgrades, HMI replacements, BOP/DCS integration, control systems life extension, operator training, 24-hour forced outage support, instrument installation and calibration.

  • MKIV CRT Replacement Project

    MKIV CRT Replacement Project

    MKIV CRT Replacement

    Upgrade existing “Obsolete” CRT monitor with New LCD monitor. Installation time 1-2 hours.

  • Duct Burner PLC Replacement

    Duct Burner PLC Replacement

    Duct Burner PLC Replacement

    The original Burner Management System at Cardinal Cogen was originally supplied by Coen in 1985. The system used a GE Series 6 programmable logic controller (PLC) for sequencing and control.…

  • Plant Outage Upgrades and AREP

    Plant Outage Upgrades and AREP

    Inland-Temple Plant

    During the February 2004 outage of the Inland-Temple plant (Now New-Indy Container) in Ontario California, CSE Engineering provided a wide range of services to enhance the instrumentation and control systems of…